Pakington Street - development
Geelong West
Tilt-up pre-cast concrete construction: manufactured off-site ensures high accuracy/factory conditions.
Hope Street - Office Complex
Geelong West
Steel portal frame construction. Here we see the exposed Z perlins, Rafters, Cross Bracing, Columns, and connection cleats.
Tilt-up concrete panels .
Detail of fly bracing > purlins to rafter connection. No welding is evident, hence holes have been pre-cut saving time and health/sa
Bolted connection as opposed to welding. These holes are pre-determined by engineers.
Tuesday, June 3, 2008
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment