‘Mega steel structure amasses modern art’
Queensland Gallery of Modern Art:
- Steel construction
- Architects: Lindsay and Kerry Clare.
- The structures distinctive cantilevered roof provides shade to extensive steel framed glazing from the sub-tropical sun.
- Complex hip connection geometry was modeling using AutoCAD.
- The structural design for each corner of the roof required complex steel fabrication and erection methodology.
- ‘We trial-assembled each corner structure of the roof off-site, so they correctly aligned when erected on-site’
- ‘The site boasts one of the longest columns on a building in Brisbane. The impressive 23-metre high external column, constructed from OneSteel 300PLUS, was designed to have no lateral support
- Hidden connections using ‘shee-bolts’ in the steelwork produced a clean looking façade.
- Standard drainage pipes weren’t an option, an innovative system whereby all pipes were installed in the roof cavity was developed. Thus, there are no visible pipes.
- Tower cranes were used instead of multiple 100tonne and 50tonne mobile cranes, cutting erection by ten weeks
- The sequencing of scheduling was monitored very carefully to eliminate double handling and paint damage.
‘Steel Australia’ – March 2007 Volume 20 No.1