Tuesday, June 3, 2008
Site Visits
Site Visits
Pakington Street - development
Geelong West


Tilt-up pre-cast concrete construction: manufactured off-site ensures high accuracy/factory conditions.
Hope Street - Office Complex
Geelong West

Steel portal frame construction. Here we see the exposed Z perlins, Rafters, Cross Bracing, Columns, and connection cleats.
Tilt-up concrete panels .
Detail of fly bracing > purlins to rafter connection. No welding is evident, hence holes have been pre-cut saving time and health/sa


Bolted connection as opposed to welding. These holes are pre-determined by engineers.
Geelong West


Tilt-up pre-cast concrete construction: manufactured off-site ensures high accuracy/factory conditions.
Hope Street - Office Complex
Geelong West


Steel portal frame construction. Here we see the exposed Z perlins, Rafters, Cross Bracing, Columns, and connection cleats.

Tilt-up concrete panels .